Preparation of a comprehensive Asset Management Plan and use fiscal notes and policy analysis to assist in making informed investment choices to achieve sectorcity goals.We join hands with our clients to ensure that the projects are executed as.Project management services Procurement assistance for FGD Contract finalization, review of FGD contractors drawings and documents.
Covering complete power station including Civil, Mechanical, Electrical, IC and 3D. Tuticorin Thermal Power Plant Inplant Training Report Full Detailed EngineeringProcurement Assistance, Full Detailed engineering executed in multiple lot contracts, Interface Engineering and review engineering. Optimum layout of plant using PV syst. Electrical system Design for Power evacuation - Infrastructure Design for Site grading, roads (main Arterial), water management, utility buildings, fencing and watch towers - Weather Monitoring stations - IT and Telecom infrastructure concept design - 3D electronic representation of the Park - Technical specifications for procurement and Technical evaluation reports. North East Agra power superhighway is worlds first multi-terminal UHVDC transmission system with 6000 MW UHVDC link operating at 800 kilovolts (kV). Tuticorin Thermal Power Plant Inplant Training Report Code And DetailingDesign and detailed engineering was carried out as per IS code and detailing was implemented to the special technical requirement as per ABB standards. The scope of work included all buildings and structures made of concrete, steel structures, equipment foundations including ground improvement by the use of stone columns. In September 2005, the CMWSSB signed a bulk water purchase agreement with CWDL to purchase water from the plant. At the end of the 25-year agreement, the plant will be transferred to the Government of Tamil Nadu. With an installed capacity to produce 100 million liters of drinking water per day (MLD), it is the largest such plant in operational in India. Befesa Spain had entrusted the work of Detailed Engineering services to Fichtner India. The scope involved development of two stage coal crushing, 6 kms conveying to stockyard, stacking and reclaiming, conveying till customers transfer tower. The initial annual mining, capacity is 10 Million TPA and augmented to 15 Million TPA. The scope involves limited review of solar technology, and complete review of BOP works. Fichtner India executed the assigned scope with due diligence and processed the documents submitted to enable uninterrupted construction at site as well as procurement works. Site has progressed considerably in civil front as well as erection of solar panels and some of the critical components of solar field. Involved in supporting the client in areas like project planning, budgeting, supervision, monitoring and evaluation, reportages and coordination to ensure timely project development and implementation. Grading Drainage plan includes calculating Finished Floor, Finished Pads, design of retention Basin and Finished contours. Paving plans includes Paving profiles, construction notes and miscellaneous notes, creating Back of Curve table, Catch basin and scupper design and drafting and storm drain pipe profile. Utility plans including sewer profiles, water plans and construction notes and miscellaneous notes. Engineering for water supply, retention basins, walkway meandering and services integration etc. The raw water pumping flow rate is 4800Cu.MHr through 1100MM diameter GRP pipeline.Zero liquid discharge plant envisaged for the plant would optimise the raw water intake for the plant. One of the challenges enroute was crossing of 765kV DC transmission line. Financial assessment of the ULBs in terms of sources and uses of funds, base and basis of levy, revision history and impacts and other fiscal parameters.
0 Comments
Leave a Reply. |